Sacred Heart Cathedral sanctuar




One Mill Street, Suite 202
Farmville, Virginia 23901
(434) 392-5283
(804) 355-6106
fax (434) 392-1529




Where does your church want to be
at the end of the design process?

At the end of the design process the building committee needs to look back at their original objectives. Does the final product meet the overall objectives of the congregation or parish?

If the design does not inspire and excite the building committee, it may well be a design that cannot be built. If those who designed a project are not enthusiastic about it, the fund raising and construction phases of the project will be much more difficult, and perhaps unattainable.

Look back, answer all the questions again, and see if your building committee is excited and enthusiastic about the project.

Contact us through this site, or over the telephone, and we will be happy to meet with your building committee to help answer all these questions and develop a plan that meets your congregation's individual needs and wants.



Contact Us logo